Boston Biomedical, Cambridge, MA

  • 60,000sf build out of their new corporate headquarters
  • Design/Build three floors of cutting edge flexible laboratory space and corporate offices
  • Greatly reduced schedule and cost.
  • The ductwork was loaded onto the jobsite and installation began the same day of receiving the building permit.
  • Piping and electrical systems were prefabricated off site and were being installed within a few days of starting the project.
  • Research facility completed under budget.